Where team conversations become finished work.
The connected workspace for small teams. Talk in topics, turn any message into a task, plan sprints, run meetings and keep every file — all in one place, all linked.
- Free for up to 5 editors
- Viewers always free
- No credit card
Trial a low-noise piling rig near the boundary
Adopt BIM Level 2 for clash detection across trades
Bring forward the lift installation to aid logistics
Switch the façade to a unitized curtain-wall system
The council wants the revised fire strategy before they sign off. Can we get it to them by Thursday?
@Rana the steel mill still hasn't confirmed delivery. Level 4 could slip two weeks.
This is a working copy of Polaris. Click anything — nothing you do leaves your browser.
Your project shouldn't live in five apps.
Chat here, tasks there, the backlog in a sheet, meetings in a calendar, files in someone's drive. Every handoff is where context gets lost.
One decision, five places, and nobody sure which one is true.
Team chat
Omar: the council wants the fire strategy by Thursday
Buried 300 messages up
Task tracker
Fire strategy — no owner
Copied by hand, link lost
Spreadsheet
Decisions log, row 48
Nobody updated it
Calendar
Fire review · Wed 15:00
No agenda, no follow-up
Shared drive
fire_strategy_final_v3 (2).pdf
Which version is current?
Polaris replaces the handoffs with one connected workspace.
From first message to shipped work — in one flow.
Every step here is live. Scroll and the workspace follows — or click into it and try the step yourself.
01Talk
Talk it through in Second Brain.
Topic-based conversations with threads, mentions and unread tracking — your project's discussion, organised by what you're working on.
Switch topics, filter to Mentions, or post a message of your own.
Trial a low-noise piling rig near the boundary
Adopt BIM Level 2 for clash detection across trades
Bring forward the lift installation to aid logistics
Switch the façade to a unitized curtain-wall system
The council wants the revised fire strategy before they sign off. Can we get it to them by Thursday?
@Rana the steel mill still hasn't confirmed delivery. Level 4 could slip two weeks.
01Talk
Talk it through in Second Brain.
Topic-based conversations with threads, mentions and unread tracking — your project's discussion, organised by what you're working on.
Switch topics, filter to Mentions, or post a message of your own.
02Turn into work
One click from message to task.
Classify any message into a task, a meeting or a log entry. AI drafts the details, and the original conversation stays linked.
Hover the newest message and press Classify — or pick Task, Log or Meeting yourself.
03Plan
Shape the backlog, run the sprint.
Prioritise in the backlog and pull work into sprints. Projects that don't run sprints get a Kanban ready lane, or simply the default board.
Open a sprint and drag work into it from the backlog.
04Track
Watch the sprint move on the board.
Every task sits in the column that matches its status: Planned, In progress, Testing, Done. Move a card and the whole team sees it — with the conversation it came from still attached.
Drag a card to another column, or use Move to on any card.
05Meet· Premium
Meetings that remember.
Schedule in the calendar, link the topic and tasks a meeting is about, and keep the agenda and notes with the work.
Drag a meeting to another time, or drag across empty hours to book one.
06Decide
Every decision, on the record.
Log decisions, risks and assumptions by topic, so new teammates can see why — not just what.
Filter by type, search, or change a status.
07Deliver· Premium
Files, status and history in one place.
Assets keep every document and link next to the project, and everyone can see what's done and what's next.
Drop any file onto the list. It stays on your device.
Trial a low-noise piling rig near the boundary
Adopt BIM Level 2 for clash detection across trades
Bring forward the lift installation to aid logistics
Switch the façade to a unitized curtain-wall system
The council wants the revised fire strategy before they sign off. Can we get it to them by Thursday?
@Rana the steel mill still hasn't confirmed delivery. Level 4 could slip two weeks.
AI that actually knows your project.
Ask Polaris to create, update or find tasks in plain language. Turn a long thread into a clear task. Draft a log entry from your notes. It works from your real project — not a blank prompt.
Click a prompt and the assistant answers on the board.
AI credits included on every plan.
Tasks (9)
Test and balance the ventilation
Install temporary site lighting
Carry out the compaction testing
Raise RFIs for design clarifications
Bring forward the lift installation
Conduct the rebar inspection
Lay the access road sub-base
Install fall-arrest anchors on the roof
Carry out concrete cube testing
The details that make a team work well.
Each of these works. Tick a task, switch the project type, change someone's role.
Your day at a glance
Tasks due, mentions and upcoming meetings in one feed.
Good morning, Rana
0/2Your tasks
Mentions
Tarek the steel mill still hasn't confirmed delivery. Level 4 could slip two weeks.
Next meeting
Ticking a task here moves it on the boards above.
Default, Scrum or Kanban
Pick how each project runs when you create it: a plain task board, a backlog with sprints, or a backlog with a ready lane.
Backlog and sprints, for iterative planning.
Backlog(5)
- Order rebar for level 4RVT-T330TM
- Prepare the façade mock-up reviewRVT-T341MA
- Update the crane lift planRVT-T352SK
- Confirm MEP riser sizesRVT-T360LF
- Seal the basement construction jointsRVT-T372HS
Sprints(2)
- Complete the topographic surveyRVT-T356SK
- Pour the level 3 slabRVT-T395TM
Sprint 22(2)Next
Send backlog work into Sprint 22, or back again.
Roles that make sense
Admins, editors and viewers, with access set per project.
- OHOmar HaddadAdmin
- SKSara Khalil
- TMTarek Mansour
- MAMaya Aziz
- LFLina Farouk
A searchable history
Find why something was decided months later, in seconds.
- DecisionAdopt BIM Level 2 for clash detection
- RiskSummer heat affecting concrete curing
- IssueRain delayed the raft foundation pour
On any screen
This is the real workspace, not a picture. Pick a screen and watch it rearrange itself: a side rail on desktop, a tab bar on the phone.
Tasks (9)
Test and balance the ventilation
Install temporary site lighting
Carry out the compaction testing
Raise RFIs for design clarifications
Bring forward the lift installation
Conduct the rebar inspection
Lay the access road sub-base
Install fall-arrest anchors on the roof
Carry out concrete cube testing
A ready setup for every kind of work.
Every project starts from a template, so its statuses, task types, meetings and roles already speak your team's language. Pick one to open the project it sets up, then make it yours.
Pick a template to open the project it sets up.
Mobile app 2.0
New project from the Software template
Backlog2
In progress1
In review1
Done1
On hold0
Click a card to move it to the next status. Add a status and it becomes a column.
A starting point, not a rule. Each list can be renamed, reordered and extended in every project.
Built for Arabic, not translated.
Every person can switch the whole workspace to Arabic, with a true right-to-left layout, Arabic typography and Western digits.
Same project, same board. Switch it and watch the layout mirror.
المهام (9)
اختبار وموازنة التهوية
تركيب إنارة مؤقتة للموقع
إجراء اختبارات الدمك
رفع طلبات استيضاح للتصميم
تقديم موعد تركيب المصاعد
فحص حديد التسليح
تنفيذ طبقة أساس طريق الوصول
تركيب نقاط الحماية من السقوط على السطح
إجراء اختبارات مكعبات الخرسانة
One workspace instead of five.
Try it on one project. No migration, no big switch.
01Project conversations
The usual stack: A separate chat app
Polaris: Topics and threads next to the work
02Tasks and board
The usual stack: A separate task tracker
Polaris: Built in, linked to the conversation
03Backlog and sprints
The usual stack: A spreadsheet or another tool
Polaris: Built in
04Meetings
The usual stack: A calendar that knows nothing about the work
Polaris: Linked to the topic and its tasks
05Files
The usual stack: Someone's drive
Polaris: Next to the project
06Decisions
The usual stack: Lost in chat
Polaris: On the record in Logs
07AI
The usual stack: A blank chat box
Polaris: Works from your real project
08Subscriptions
The usual stack: One for every tool
Polaris: One, and viewers are free
Start free. Pay only for the people who edit.
Admins and editors count as seats. Viewers are unlimited and always free.
Free
For small teams getting started.
$0free forever
Editor limit on this plan: 5
- Second Brain, tasks, backlog, sprints and logs
- 3 active projects
- Up to 5 editors
- Unlimited viewers
- 500 MB storage
- 10 AI credits a month
Pro
For growing teams with more projects.
$70per editor / year
Team total (6 × seat):$420/ yearViewers (12): free
- Second Brain, tasks, backlog, sprints and logs
- 50 active projects
- Up to 20 editors
- Unlimited viewers
- 100 GB storage
- 30 AI credits a month
Premium
Most popularEverything, including Meetings and Assets.
$140per editor / year
Team total (6 × seat):$840/ yearViewers (12): free
- Second Brain, tasks, backlog, sprints and logs
- Unlimited projects
- Up to 50 editors
- Unlimited viewers
- 500 GB storage
- 80 AI credits a month
- Calendar and Meetings
- Assets
Prices exclude any applicable taxes.
Good questions, straight answers.
01How is Polaris different from a task tracker?
A task tracker starts once work is already a task. Polaris starts earlier, in the conversation: your team discusses ideas in topics, and any message can become a task, a meeting or a log entry that stays linked to where it came from. The backlog, sprints, board, calendar and files sit in the same workspace.
02Can it replace our team chat?
Polaris is built for project conversations — topics, threads and mentions tied to the work. Many teams move their project discussion into Polaris and keep a general chat app for everything else. Start with one project and see what moves.
03Do we need to migrate everything first?
No. Start with one project and invite the people working on it. There is nothing to migrate before you begin.
04Is the free plan really free?
Yes. It includes 3 projects, up to 5 editors, 500 MB of storage and 10 AI credits a month. No credit card is needed.
05How does pricing work?
Paid plans are billed per editor. Admins and editors count as seats; viewers are unlimited and free. Premium adds Calendar and Meetings, Assets and more AI credits, and you can try it free for 14 days.
06Does Polaris support Arabic?
Yes. Each person can switch the whole workspace to Arabic, with a full right-to-left layout.
07Who builds Polaris?
Polaris is built and run by Hexifyer.
08Is our data private?
Your workspace is visible only to the people you invite, and roles decide who can view or edit each project. Our privacy policy explains how we handle data.
Bring your next project home.
Start free on one project today. No setup, no five-app juggling.
- Free for up to 5 editors
- Viewers always free
- No credit card